Example- LG 5110 with 1 Analog Output Connect 24 Volt supply to end terminals marked as +24VDC & -24VDC- This will energies the circuit Connect the terminals marked as 1 & -24VDC (Parallel wires) to the PLC- This will provide the Analog Output of ...
1. Open GW1000 Default Home page using its IP. 2. Enter default User name(admin) & Password(12345). After successfully login, You will get GW Home Page. 3. Go to Misc. Setting & Change protocol from MODBUS_RTU to MODBUS_TCP/IP. Now click Update. 4. ...
Yes, we can connect 3 Phase Amp meter and KWH meter with the same CT. not need of separate CT for both meters. The same RYB CT's may connect to both meters for measurement. Please do the connection of CT to meters as explain below. R phase CT S1 ...
Elnet DS should be installed when you connect Prepaid meter with GW2000. Elnet DS is used to recharge the prepaid meter when it connects to MQTT gateway (GW2000). Note: Elnet DS is not required when Prepaid meter is connected to GW1000. *** End of ...