Article 3.2.4A : Typical schematic for EB-DG changeover through POWER ASSIST.
Article 3.2.4A : Typical schematic for EB-DG changeover through POWER ASSIST.
Kindly download the attached schematic diagram.
Related Articles
Article 2.0.4D : What is the purpose of Power Assist?
Power Assist can be installed between Meter & Gateway to avoid "240V AMF input". Existing method (before Power Assist) - "240V AMF" input needs to be connected to the meter to detect the power as DG. New method (After Power Assist) - When power ...
Article 4.3.5C : Typical installation schematic for smart card based prepaid meters.
Kindly download the attached schematic diagram.
Article 3.1.3A : Typical installation schematic of Water Management Solution.
Kindly download the attached schematic diagram.
Article 3.1.3B : Typical schematic for Elnet EMS solution.
Kindly download the attached schematic diagram.
Article 4.3.5A : 1 Phase Prepaid meter - Installation Schematic Diagram.