Please find the below image of the backside of ADC & VDC. the input of ADC and VDC is shown in SR No sticker it should be selected by the customer as per requirement. Vin or I/P will be shown in Sr no sticker. Standard input and programming range is ...
Consumption Load If users are metering a load that is consuming energy, seeing negative power (kW) readings would cause errors when reading the total consumed energy on the meter. Negative readings can be a result of the following: CT reversal: If ...
When KVA value reaches maximum value, meter will automatically reset to 0. When the meter resets, balance is also reducing which should not happen. In such case, firmware needs to be updated (to version 3.09) in that prepaid meter. Note: This is ...
Yes, we can connect 3 Phase Amp meter and KWH meter with the same CT. not need of separate CT for both meters. The same RYB CT's may connect to both meters for measurement. Please do the connection of CT to meters as explain below. R phase CT S1 ...
Yes. It is possible. It's not available by default but we can customize the software to sync time (RTC). RTC - "Real Time Clock" *** End of article ***