When KVA value reaches maximum value, meter will automatically reset to 0. When the meter resets, balance is also reducing which should not happen. In such case, firmware needs to be updated (to version 3.09) in that prepaid meter. Note: This is ...
Yes, we can connect 3 Phase Amp meter and KWH meter with the same CT. not need of separate CT for both meters. The same RYB CT's may connect to both meters for measurement. Please do the connection of CT to meters as explain below. R phase CT S1 ...
By using our software only prepaid system will work. Or else the same meters can be used as a postpaid meter if third-party software is used. 1. Third party software is very much dependent on network Healthiness, All prepaid logics are monitored ...